Aircon Installations limited carry out total package contracts, including all the ancillary elements, such as:

  • Pump replacement
  • Power and control wiring
  • Control panels
  • Steelwork supports, platforms, handrails and steps
  • Builders work
  • Plant condition surveys
  • Feasibility studies
  • Water testing and chemical treatment
  • Acoustic treatment
  • Specialist demolition and heavy handling
  • Runaround coils

Mechanical Works

We are fluent in all aspects of mechanical design. We can optimise pipework layout to give the best performance when connecting new plant to the existing system; this usually requires a detailed look at what’s going on in the rest of the building.

Electrical Works

Often it is necessary to make major alterations to the existing electrical supplies in order to accommodate new chilled water plant. This includes installing new panels and new cables through the building.